Denny Middle School / Chief Sealth High School Property Files
Language of Description
English
Restrictions Apply
No
Inventory
1957 / General Shop Drawings / blueprints / Box 1 * 1957-1958 / General Shop Drawings / blueprints / Box 2 * 1960 / Stadium Shop Drawings / blueprints / Box 2 * 1960 / Architects' Design Analysis Denny Play-field & Stadium / booklet / Box 2 * 1968 / Architects' Preliminary Plans of Alterations / booklet / Box 2 * 1968 / Architects' Preliminary Plans of Alterations / booklet / Box 2 * 1968 / Educational Specifications / booklet / Box 2 * 1970 / City & County Permits & Correspondence / folder / Box 2 * 1955-1974 / Property / folder / Box 2 * 1959-1978 / Permits / folder / Box 2 * 5/29/1980 / Permits / folder / Box 2 * 8/4/1995 / Denny Sealth Field Master Plan Report / booklet / Box 2 * 1999 / Permits / folder / Box 2 * 2002 / Box 2 * 2003 / Education Specifications / folder / Box 2 * 2004 / Geotechnical Inspection Report / folder / Box 2 * 2004 / Construction Testing Lab / folder / Box 2 * 1958-1974 / Denny Permits / folder / Box 3* 1984 / Denny Asbestos Notice / folder / Box 3* 1998 / Compliance for Lead and Asbestos for Sharples and Denny / binder / Box 3* 2005 / Materials Testing and Geotech - BEX II / folder / Box 3 * 2006 / Construction Testing Lab / folder / Box 3 * 9/2007 / Building Historic Value Report / booklet / Box 3 * 9/2007 / Building Historic Value Report / booklet / Box 3 * 9/2007 / Building Historic Value Report / booklet / Box 3 * 9/2007 / Building Historic Value Report / booklet / Box 3 * 11/2007 / Landmarks / folder / Box 3 * 2007 / Project Overview / folder / Box 3 * 2024-2, R.E4.48, Box 12 - Denny-Sealth Construction Project files c. 2009-2012: Final Commissioning Report, Existing Conditions Survey/Assessment, Hazmat, Seismic Condition Assessment, Stormwater, Subsurface Exploration, Transportation Master Plan, Value Engineering. 2024-2, R.E4.41, Box 5 - Denny-Sealth Construction Project files c. 2009-2012: BOD, Closeout Documents, Final Commissioning Report, Final Acceptance, O&Ms CD, School Binder CD 2024-2, R.E4.40, Box 4 - Denny-Sealth Construction Project files c. 2009-2012: OSPI Form D Documents 2024-2, R.E4.39, Box 3 - Denny-Sealth Construction Project files c. 2009-2012: CDs: Stormline & SDOT Plans, Energy lifecycle costs, Improvements: Subsurface Exploration, Geo Hazards and Geotechnical Engineering report, Stormwater pollution prevention plan, addendum to SEPA checklist, SEPA checklist, DNS, Limited Hazardous Materials Survey Report, Transportation impact analysis, Ed Specs/Education Specifications 2024-2, R.E4.38, Box 2 - Denny-Sealth Construction Project files c. 2009-2012: Drainage Reports, Structural Calculations, Seismic Condition Assessment, Transportation Space Master Plan, Stormwater, water availability, stormwater general permit, arborist, water easement, VOC Screening data, Landmark docs, liens, opening statement/committee to Save Schools -Chris Jackins RE: Denny @ Sealth 2024-2, R.E4.37, Box 1 - Denny-Sealth Construction Project files c. 2009-2012: Title, Permits, easement, legal description, master use permit (MUP) (CD), Fire Dept, Department of Planning and Development (2 folders), Certificate of Occupancy, additional insurance folder, Meng Analysis, Value Engineering Report, Energy